TRC PRINCIPAL DEPOT

CLIENT
Toowoomba Regional Council

DURATION
8 Months

VALUE
$2.6 M

LOCATION
Toowoomba, Queensland
Construction of a new principal depot for Toowoomba Regional Council. 
Simultaneous delivery of multiple buildings across a 28 Ha Greenfield site, including a central operations building, three workshops, a central stores building, a nursery building and a SES depot.

A massive undertaking of in ground water and drainage infrastructure, including fire mains, rain water, potable water mains, sewer and stormwater.

A 130L/S dual fire pump booster system, including 540Kl of fire water storage.

This project had a large focus on water and energy efficiency, which included a huge rainwater reuse tank and water efficient fixtures and fittings which were installed in all buildings.

This project was delivered in an eight month period.

More projects

Our Work

by Danny Summers 07 Dec, 2020
Commenced in December 2016 this project required the relocation of over 9km of water and gas infrastructure through the town of Dalby, to accommodate the widening and major upgrade of the Warrego
by Danny Summers 22 Nov, 2020
The Glen McCracken Gymnasium at Toowoomba Grammar School is equivalent in height to a 6 Storey Apartment Block, the upper level house 2 Full Sized basketball courts as well as a Canteen and amenities
by Danny Summers 21 Nov, 2020
4 Storey Apartment building comprising of 11 Total self contained 1,2 and 3 Bedroom apartments centrally located between St Vincents Hospital and Toowoomba Grammar School. Underground basement carpark
More posts
Share by: