TRC PRINCIPAL DEPOT
CLIENT
Toowoomba Regional Council
DURATION
8 Months
VALUE
$2.6 M
LOCATION
Toowoomba, Queensland
Construction of a new principal depot for Toowoomba Regional Council.
Simultaneous delivery of multiple buildings across a 28 Ha Greenfield site, including a central operations building, three workshops, a central stores building, a nursery building and a SES depot.
A massive undertaking of in ground water and drainage infrastructure, including fire mains, rain water, potable water mains, sewer and stormwater.
A 130L/S dual fire pump booster system, including 540Kl of fire water storage.
This project had a large focus on water and energy efficiency, which included a huge rainwater reuse tank and water efficient fixtures and fittings which were installed in all buildings.
This project was delivered in an eight month period.